• High physical strength, good impact resistance and resistance to deformation
• Extremely lightweight, with a high safety factor for the facade
• It features Class A2 fire resistance and comes with a long warranty period
• Easy to install and adaptable to different designs, making it suitable for a wide range of building structures
• Highly customizable, available in various sizes, thicknesses, colors, and shapes to meet different design requirements and achieve the design effect
Product Name:Hanging ceiling system
Metal Alloy:3000 series aluminum、5000 series aluminum
Regular Thickness:0.6 mm,0.8 mm,1.0 mm,1.2 mm,1.5 mm
Standard Height: 100 mm,150 mm,200 mm
Surface Treatment:Powder coat, Thermal transfer coat
Applications:Suitable for crowded public places to facilitate air circulation,such as stadiums, stations, shopping malls, corridors, airports, hospitals, and other public facilities.
Warranty:Powder coating 10–25-year warranty, Thermal transfer coat 15–20-year warranty
Fire Performance:A2
Weather Resistance:Strong
1. Elevation Survey & Layout Marking Draw horizontal elevation control lines and baffle arrangement lines according to construction drawings, mark fixed positions of roof expansion bolts and hanging rods to confirm the overall suspended height of the baffle ceiling.
2. Install Hanging Rods & Main Keel Frame Drill expansion anchor bolts on the building roof slab, fix vertical galvanized hanging rods, mount horizontal main light steel keels and repeatedly adjust overall horizontal flatness.
3. Mount Special Snap Hanging Clips Install dedicated aluminum hanging clips under main keels at equal intervals, align clip spacing with the pre-designed gap width of suspended baffles.
4. Sequentially Hang & Lock Baffles Lift each aluminum baffle, hook the top snap edge into the hanging clip and press down to complete locking; install baffles row by row to ensure uniform vertical straightness and consistent gaps between panels.
5. Auxiliary Equipment Matching & Edge Finishing Reserve gaps for linear lamps, air outlets, smoke detectors and sprinklers between baffles; install customized wall angle trim for ceiling perimeter closing.
6. Overall Inspection & Surface Cleaning Check vertical straightness of all baffles, uniform gap width, firm snap connection and intact coating surface; wipe construction dust and residual stains on panels.
1. Aluminum Suspended Baffle
2. Special Aluminum Snap Hanging Clip
3. Main Light Steel Keel
4. Height Adjustable Galvanized Hanging Rod
5. Roof Slab Expansion Anchor Bolt
6. Optional Windproof Anti-Drop Clip
7. Optional Sound Absorbing Cotton
· Keep all hanging clips at the same horizontal level to avoid tilted and uneven vertical lines of baffles;
· Handle baffles gently during construction to prevent profile deformation, edge bending and coating scratches;
· Ensure full snap locking between baffles and clips; install windproof clips for semi-outdoor projects to prevent falling under wind pressure;
· Reserve reasonable horizontal expansion gaps at baffle joints to eliminate thermal deformation caused by temperature changes.
