Galaxy Hotel (Macau) Phase 4

Galaxy Hotel (Macau) Phase 4(20135m²)

2026-07-02

Galaxy Hotel (Macau) Phase 4 is located in Macau's core Cotai Resort, a large-scale complex integrating high-end hotels, entertainment, cultural experiences and commercial supporting facilities. The project has a total construction area of approximately 270,000 square meters, featuring around 1,350 luxury guest rooms and suites, as well as a 5,000-seat theater, a waterfront leisure platform, high-end dining, retail, and entertainment facilities. WholeTops was responsible for the production of the metal facade system, delivering 20,136 square meters of aluminum panels with high-precision manufacturing technology. The panels features a curved design and offers excellent wind resistance. The panels incorporate numerous stiffener and are connected with hanger, ensuring high stability. Some aluminum panels are backed with insulation and soundproofing material, achieving the building’s unique aesthetic while ensuring structural safety, spatial comfort, and an optimal user experience.


未标题-1.jpg